Melbourne, Australia. Varden today opened their new factory, which has been custom designed to produce up to 50 million units of high performance packaging every year.
The factory is 2500m2 and meets the most stringent packaging production regulations, and the high speed production line installed by Robert Bosch Australia, works to Varden’s unique and patented design, and can produce more that 30 million packs per year. The layout was created by the design consultancy BECA engineering, and uses a digital twin to optimise production and training, and allow Varden to put down another plant anywhere in the world with minimal design or engineering work.
See more about BECA and digital twins here